A research and community-training excavation took place over two summer seasons in 2013-14 within the Roman extramural settlement at Maryport, including the backplot. The primary aim of the project, which attracted around 125 volunteers, was to enhance understanding of the settlement through the excavation of a single building plot, the first time this had been undertaken at Maryport in modern times. Using geophysical survey evidence, a plot located 150 m north-east of the fort, adjacent to the main Roman road, was selected for investigation.

The earliest feature was a small ditch, possibly part of a late pre-Roman or early Roman field system, but there was little evidence for activity before the late Hadrianic period (c AD 130+), when a timber ‘strip building’ was constructed on the street frontage. This went out of use in the mid-second century, but was immediately replaced by a similar structure. Following the demolition of this building around the end of the century, the plot was seemingly abandoned for a time, after which a stone-footed strip building was erected, probably c AD 220-30. Although direct evidence was sparse, all three buildings may have been multifunctional, possibly combining residential and commercial functions. To the rear was a palimpsest of features, including plot-boundary ditches and a group of wells and/or water cisterns.

The Roman properties on either side of this also contained stone-footed strip buildings during the third century, one separated by a minor road, extending north-west from the main road. The stone-footed building, and probably also those in the adjacent plots, had been demolished by c AD 270. Subsequent activity was extremely limited, but included the cutting, in the late third/early fourth century, of a ditch along the north-eastern boundary of the targeted plot. Thereafter, the site seems to have been abandoned completely, and no evidence of post-Roman activity was identified

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tuotteella on huono saatavuus ja tuote toimitetaan hankintapalvelumme kautta. Tilaamalla tämän tuotteen hyväksyt palvelun aloittamisen. Seuraa saatavuutta.
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
The Maryport Roman Settlement Project - Excavation 2013-14
Näytä kaikki tuotetiedot
ISBN:
9781907686337
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste