SULJE VALIKKO

avaa valikko

Electricity Reform in China, India and Russia - The World Bank Template and the Politics of Power
170,00 €
Edward Elgar
Sivumäärä: 384 sivua
Asu: Kovakantinen kirja
Julkaisuvuosi: 2004, 27.08.2004 (lisätietoa)
Kieli: Englanti
Examining the reform and restructuring of the electricity industry in China, India and Russia, this book explores the way that local conditions and institutions shape the commitment, direction and speed of public utility reform in the three countries. It questions the validity of the argument that one model for electricity reforms will work in all countries, on the grounds that the industry is the same everywhere, by examining the World Bank's involvement in economic reforms in developing and transition economies.The author asks how the template developed by the World Bank has affected the three countries and seeks to explain why changes took place, how effectively they have been proceeding, and what the consequences are for these countries. In so doing, Electricity Reform in China, India and Russia challenges both the assumption behind the new reform paradigm - that market competition is the panacea for all the ills of the electricity industry - and the oft-cited belief that a single template can work in different environments.

China, India and Russia have different political and economic systems and at different development stages. Xu Yi-chong uses the experience of the three countries to illustrate the complications created by the use of a single template, a policy encouraged by the World Bank, to direct reform and the need to appreciate the different problems that each had to overcome.

Academics and students who are interested in comparative politics, comparative economics, public policy and particularly the reform of public utilities will find this work of great interest, as will practitioners and those who are involved in restructuring the electricity industry worldwide.

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tilaustuote | Arvioimme, että tuote lähetetään meiltä noin 4-5 viikossa | Tilaa jouluksi viimeistään 27.11.2024
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
Electricity Reform in China, India and Russia - The World Bank Template and the Politics of Power
Näytä kaikki tuotetiedot
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste