Phase Two Evaluation Findings - The Segmental Concrete Channel Bridge System
This report represents the second component of the HITEC technical evaluation of the J. Muller International (JMI) Channel Bridge, a precast segmental overpass bridge system intended for use in either bridge replacement projects or new construction. This report describes a full-scale demonstration of the technology. The evaluation was conducted based on the technical evaluation plan developed in June 1995 and follows the technical analyses and evaluation of design attributes and performance history, with emphasis on the unique aspects of this technology.
Tilaustuote | Arvioimme, että tuote lähetetään meiltä noin 4-5 viikossa