SULJE VALIKKO

Englanninkielisten kirjojen poikkeusaikata... LUE LISÄÄ

avaa valikko

Evaluation Findings - The Segmental Concrete Channel Bridge System
37,00 €
American Society of Civil Engineers
Sivumäärä: 33 sivua
Asu: Kovakantinen kirja
Julkaisuvuosi: 1996, 31.07.1996 (lisätietoa)
In 1994, the Highway Innovative Technology Evaluation Center (HITEC) undertook a technical evaluation of the JMI Channel Bridge, a precast segmental overpass bridge system intended for use in either bridge replacement projects or new construction. A technical evaluation plan was developed in June 1995, consisting of two components: technical analyses and evaluation of design attributes and performance history, with emphasis on the unique aspects of this technology; and a full-scale demonstration of the technology (the results of which will be presented in a separate HITEC evaluation report). This report contains the findings of technical analyses and evaluation of the Channel Bridge.

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tuote on tilapäisesti loppunut ja sen saatavuus on epävarma. Seuraa saatavuutta.
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
Evaluation Findings - The Segmental Concrete Channel Bridge System
Näytä kaikki tuotetiedot
ISBN:
9780784401576
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste