SULJE VALIKKO

avaa valikko

The Japanese Aircraft Carrier Taiho
44,80 €
Kagero Oficyna Wydawnicza
Sivumäärä: 92 sivua
Asu: Pehmeäkantinen kirja
Julkaisuvuosi: 2016, 31.07.2016 (lisätietoa)
Kieli: Englanti
The design work on the new carrier commenced as early as 1937 and the initial design was unveiled on 27 November and received the number “02”. On 21 July 1938 corrections were done to the design and it was approved.

The ship of displacement of 27.800 tons was ordered. It was included into Navy development program, approved on 8 December 1938. After the acceptance of the main specifications of the carrier work on the detailed design could be commenced (the work began in December 1939). Due to several delays the ship was laid down as late as 10 July 1941 at Kawasaki shipyard in Kobe. Until 5 March 1943, when the ship was named, she was known as the hull number 130.

The official christening took place before launching on 7 April 1943. The ship was named TAIHO (Great Phoenix).

On 3 February 1944 the ship was towed to the Navy Shipyard in Kure for further equipping. On 7 March 1944 the ship was commissioned and entered service.

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tuotteella on huono saatavuus ja tuote toimitetaan hankintapalvelumme kautta. Tilaamalla tämän tuotteen hyväksyt palvelun aloittamisen. Seuraa saatavuutta.
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
The Japanese Aircraft Carrier Taihozoom
Näytä kaikki tuotetiedot
ISBN:
9788364596759
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste