SULJE VALIKKO

Englanninkielisten kirjojen poikkeusaikata... LUE LISÄÄ

avaa valikko

Breaching the Peace - The Site C Dam and a Valley’s Stand against Big Hydro
25,80 €
University of British Columbia Press
Sivumäärä: 312 sivua
Asu: Pehmeäkantinen kirja
Julkaisuvuosi: 2018, 01.05.2018 (lisätietoa)
Kieli: Englanti
From award-winning journalist Sarah Cox comes the inspiring and astonishing story of the farmers and First Nations who stood up against the most expensive megaproject in BC history and the government-sanctioned bullying that propelled it forward.

In 2010, the BC government announced its plan to build a third hydroelectric dam on the Peace River. Although Site C would flood land of great significance to First Nations and some of Canada’s best farmland, BC Hydro, Premier Gordon Campbell, and his successor, Christy Clark, insisted it was necessary to generate jobs and clean energy.

In this powerful work, Cox reveals the true costs and hidden dangers of the project, as told to her by the local farmers, ranchers, and First Nations leaders who tried to stop the dam and the wholesale destruction of their valley in courts of law and the court of public opinion.

This modern-day David-and-Goliath story, told in frank and moving prose, stands as a much-needed cautionary tale during an era when concerns about global warming have helped justify a renaissance of environmentally irresponsible hydro megaprojects around the world.

Foreword by: Alex Neve

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tilaustuote | Arvioimme, että tuote lähetetään meiltä noin 4-5 viikossa
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
Breaching the Peace - The Site C Dam and a Valley’s Stand against Big Hydrozoom
Näytä kaikki tuotetiedot
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste