SULJE VALIKKO

Englanninkielisten kirjojen poikkeusaikata... LUE LISÄÄ

avaa valikko

Reem Fikri Mohamed Osman Digna | Akateeminen Kirjakauppa

OPTIMIZING THE OPERATION OF A MULTIPLE RESERVOIR SYSTEM IN THE EASTERN NILE BASIN CONSIDERING WATER AND SEDIMENT FLUXES

Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxes
Reem Fikri Mohamed Osman Digna
Taylor & Francis Ltd (2020)
Pehmeäkantinen kirja
94,80
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxes
94,80 €
Taylor & Francis Ltd
Sivumäärä: 172 sivua
Asu: Pehmeäkantinen kirja
Julkaisuvuosi: 2020, 01.09.2020 (lisätietoa)
Kieli: Englanti
The Eastern Nile riparian countries Egypt, Ethiopia and Sudan are currently developing several reservoir projects to contribute to the needs for energy and food production in the region. The Nile Basin, particularly the Eastern Nile Sub-basin, is considered one of a few international river systems with potential conflicts between riparian countries. In the absence of formal mechanisms for collaboration, the transboundary nature of this basin makes sound water resources development challenging. The large seasonal and inter-annual variability of the river flow exacerbates those challenges. A further complication is the high sediment load in the Eastern Nile rivers during the high flow season.

This study contributes to fill relevant knowledge gaps through a better understanding of the methods needed for a complex system of multipurpose reservoirs, considering both water quantity and sediment load. The study quantifies the impacts of water resources development in the Eastern Nile basin and identifies system management options at both regional and country level. Developing a collaborative and unified perspective of the countries towards new projects can be beneficial for all. New operation rules are proposed for improving operation of the current system when new infrastructures are developed and operated either unilaterally or, ideally, cooperatively.

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tuote on tilapäisesti loppunut ja sen saatavuus on epävarma. Seuraa saatavuutta.
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
Optimizing the Operation of a Multiple Reservoir System in the Eastern Nile Basin Considering Water and Sediment Fluxeszoom
Näytä kaikki tuotetiedot
ISBN:
9780367564414
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste