SULJE VALIKKO

Englanninkielisten kirjojen poikkeusaikata... LUE LISÄÄ

avaa valikko

L Valadares Tavares | Akateeminen Kirjakauppa

Haullasi löytyi yhteensä 5 tuotetta
Haluatko tarkentaa hakukriteerejä?



Advanced Models for Project Management
L. Valadares Tavares
Springer (1998)
Kovakantinen kirja
172,80
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Advanced Models for Project Management
L. Valadares Tavares
Springer-Verlag New York Inc. (2012)
Pehmeäkantinen kirja
172,80
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Towards the Knowledge Society - eCommerce, eBusiness and eGovernment The Second IFIP Conference on E-Commerce, E-Business, E-Gov
João L. Monteiro; Paula M.C. Swatman; L. Valadares Tavares
Springer-Verlag New York Inc. (2002)
Kovakantinen kirja
172,80
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Towards the Knowledge Society - eCommerce, eBusiness and eGovernment The Second IFIP Conference on E-Commerce, E-Business, E-Gov
João L. Monteiro; Paula M.C. Swatman; L. Valadares Tavares
Springer-Verlag New York Inc. (2013)
Pehmeäkantinen kirja
172,80
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Towards the Knowledge Society
Joao Monteiro; Paula M C Swatman; L Valadares Tavares
Springer (2014)
Pehmeäkantinen kirja
109,80
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Advanced Models for Project Management
172,80 €
Springer
Sivumäärä: 309 sivua
Asu: Kovakantinen kirja
Painos: 1999 ed.
Julkaisuvuosi: 1998, 31.10.1998 (lisätietoa)
Kieli: Englanti
Tuotesarja: International Series in Operations Research & Management Science 16
More than forty years have passed since the early attempts to model projects. A large domain of theoretical developments has grown producing a high number of analytical and numerical results, but it seems that the main model is still the same: the concept of project network. This concept has come to represent the two major features underlying the notion of a project: the sequential and the competitive nature of its components, the project's activities. Actually, the sequential property defines the structure of the project and the competitive nature stems from the use of common resources (facilities, goods, equipment, management, etc.) to carry out the different activities. However, significant advances have been achieved in project modelling, allowing the production of much more powerful results: A. the concept of precedence and the description of activities has been generalized to produce a wide range of realistic representation of projects. B. the stochastic study of the features of projects such as the duration and cost of their activities is carried out by several analytical and numerical models, allowing experimental and forecasting analyses. C. the allocation of resources can be now studied for more complex situations and restrictions. D. the financial description of projects is more accurately studied and its optimization is thoroughly pursued. E. the assessment and the evaluation of projects now can be studied within the framework of multicriteria decision theory considering multiple perspectives and supporting the project manager to select the most appropriate compromises between risk, time and expected gains.

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tilaustuote | Arvioimme, että tuote lähetetään meiltä noin 4-5 viikossa | Tilaa jouluksi viimeistään 27.11.2024
Myymäläsaatavuus
Helsinki
Tapiola
Turku
Tampere
Advanced Models for Project Managementzoom
Näytä kaikki tuotetiedot
Sisäänkirjautuminen
Kirjaudu sisään
Rekisteröityminen
Oma tili
Omat tiedot
Omat tilaukset
Omat laskut
Lisätietoja
Asiakaspalvelu
Tietoa verkkokaupasta
Toimitusehdot
Tietosuojaseloste